95: Drive Stakeholder Engagement
Specification Version: 2.0.0
Status: Accepted
Slug: 95-drive-stakeholder
Implementation Types:
- None
Descriptive Statement
Drive stakeholder engagement; make wins and misses visible.
Supplemental Guidance
These are scored as a bucket because you can do them in any order except for items 3 and 4 which come in a pair. Named contacts usually come first, since the rest is hard without knowing who to talk to.
Items 3 and 4 are deliberately a pair. A practice that publishes only wins is doing marketing, and the engineers it depends on will read it that way. Publishing a missed target in the same place is what makes the wins believable.
Regarding item 5, a persona who raises a question and never hears back stops raising them, and the practice loses the signal before it notices the silence.
Action 104 covers enabling stakeholders on policy specifically, and the FinOps Education capability covers training. This action is about the standing relationship rather than any single message.
Scoring Guide
Weight: 1.0
Formula
Measured over: the personas the practice works with during the review period.
- Named contacts (each persona the practice depends on has a named counterpart on both sides)
- Regular contact (engagement happens on a stated cadence rather than when something breaks)
- Wins published (savings and avoided cost are reported with the team that earned them named)
- Misses published (targets that were missed are reported in the same place as the wins)
- Requests tracked (a request to the practice carries an owner and a response, so a persona can see what happened to it)
10*Ceil(x/5)
Scoring Details
Score Type: bucket
| Score | Condition |
|---|---|
| 0 | No items completed |
| 2 | 1 item completed |
| 4 | 2 items completed |
| 6 | 3 items completed |
| 8 | 4 items completed |
| 10 | 5 items completed |
References
- Finops Framework - Finops Practice Operations Capability: Organizational awareness of the FinOps team, and adoption of FinOps practices and culture, is one of the capability’s measures of success. Items 1 and 2 are what that awareness is built from.
- Finops++ Score Type - Bucket: an evolution of binary, with more steps to take toward maturity.