Metadata:
  Proposed: '2025-09-16'
  Adopted: '2026-07-20'
  Modified: '2026-09-03'
  Version: 1.0.0
  Status: Accepted
  Approvers:
  - Name: Victoria Levy
    Email: vlevy573@gmail.com
    Date: '2026-07-20'
Specification:
  ID: 27
  Title: Analyze Root Causes & Fix Issues
  Description: Analyze root causes; fix tags, allocation rules, or usage issues.
  Slug: 27-analyze-root
  Implementation Types:
  - null
  Weight: 1.0
  Formula: |-
    Denominator: anomalies recorded with a true positive disposition during the review period. Items 1
    through 4 are met when the stated field is populated on 90% or more of those records.

    1. Owner and due date (each record carries a named accountable owner and an analysis due date)
    2. Root cause recorded (each record carries a root cause entry naming the change that triggered it)
    3. Cause classified (each root cause assigned exactly one category from a published, fixed
       category list)
    4. Remediation recorded (each record carries a remediation action, its completion date, and the
       measured spend delta over the period following the fix)
    5. Preventive control registered (every cause category observed 3 or more times in the trailing
       12 months has a linked policy, guardrail, budget, or detection rule)

    10*Ceil(x/5)
  Score Type: sequential
  Scoring:
  - Score: 0
    Condition: No items completed
  - Score: 2
    Condition: item 1 completed
  - Score: 4
    Condition: items 1-2 completed
  - Score: 6
    Condition: items 1-3 completed
  - Score: 8
    Condition: items 1-4 completed
  - Score: 10
    Condition: items 1-5 completed
  References:
  - Name: NIST CSF 2.0 - RS.AN-03
    Link: https://doi.org/10.6028/NIST.CSWP.29
    Comment: |-
      "Analysis is performed to establish what has taken place during an incident and the root cause of the
      incident." Item 2 is the FinOps reading of that outcome.
  - Name: NIST CSF 2.0 - ID.IM-03
    Link: https://doi.org/10.6028/NIST.CSWP.29
    Comment: |-
      "Improvements are identified from execution of operational processes, procedures, and activities."
      Item 5 is where anomaly response stops being reactive and starts changing the control environment.
  - Name: FinOps KPI - Anomaly-Detected Cost Avoidance
    Link: https://www.finops.org/kpi/anomaly-detected-cost-avoidance/
    Comment: the verified effect on spend called for in item 4 is what this KPI reports.
  - Name: FinOps++ Score Type - Sequential Process
    Link: /guidelines/scoring.md#sequential-process
    Comment: can be used whenever the steps in an action need to be completed in a certain order.
  Supplemental Guidance:
  - |
    Each item depends on the one before it, so this is scored sequentially rather than as a bucket. An
    unowned anomaly is not analyzed, an undiagnosed anomaly cannot be classified, and a cause that was
    never classified cannot be shown to recur.
  - |
    A root cause taxonomy does not need to be elaborate to earn item 3. Categories such as deployment change,
    rate or commitment change, organic usage growth, allocation or tagging defect, and third party change are
    enough to make the counts useful.
  - |
    Item 4 scores the recorded remediation and its measured spend delta, because those are the parts an
    assessor can verify. Whether a fix addressed the cause or only the symptom is a judgment the assessment
    does not adjudicate. It shows up instead in the trailing count in item 5: a symptom fix leaves the cause
    category recurring, which is what pulls the category over the threshold of 3.
  - |-
    Suppressing an alert, raising a threshold, or granting a standing exception is not a remediation action.
    Threshold changes are scored separately by action 29, where they are governed rather than ad hoc.
  Overrides: null
