Metadata:
  Proposed: '2025-09-16'
  Adopted: '2025-11-01'
  Modified: '2026-10-18'
  Version: 1.9.0
  Status: Accepted
  Approvers:
  - Name: Victoria Levy
    Email: vlevy573@gmail.com
    Date: '2025-11-01'
  - Name: Andrew Quigley
    Email: Q@mf-family.com
    Date: '2025-11-01'
Specification:
  ID: 34
  Title: Establish Scenario Decision Process
  Description: Establish decision process for which scenarios feed the forecast.
  Slug: 34-scenario-process
  Implementation Types:
  - null
  Weight: 1.0
  Formula: |-
    Measured over: the projects and optimization work feeding the forecast during the review period. These
    are few enough to enumerate, so items are assessed against each one rather than as a coverage rate.

    * Define and follow process for gathering deployment plans from teams (the process names who submits
      plans, on what cadence, and in what form)
    * Determine timeline for each new project to adjust the forecast during that time (each project carries
      start and ramp dates, so its spend lands in the periods it occurs in)
    * Determine how optimizations and lower run rate will impact the forecast on a rolling basis (committed
      optimization work is carried into the forecast as a reduction on a stated schedule)

    10*Ceil(x/3)
  Score Type: bucket
  Scoring:
  - Score: 0
    Condition: No items completed
  - Score: 4
    Condition: 1 item completed
  - Score: 7
    Condition: 2 items completed
  - Score: 10
    Condition: 3 items completed
  References:
  - Name: FinOps Framework - Planning & Estimating Capability
    Link: https://www.finops.org/framework/capabilities/planning-estimating/
    Comment: |-
      The capability asks a practice to explore scenarios in a technology category, define the scope and
      detail of an estimate, and model parameters for a future state. Its Run tier expects estimating
      scenarios to support rolling, trend-based and driver-based forecasting, which item 3 feeds.
  - Name: FinOps++ Score Type - Bucket
    Link: /guidelines/scoring.md#bucket-of-accomplishments
    Comment: an evolution of binary, with more steps to take toward maturity.
  Supplemental Guidance:
  - |
    These are scored as a bucket because you can do them in any order, though a practice usually
    gathers deployment plans before it works out how to time them into the forecast.
  - |
    Item 3 keeps a forecast from drifting upward. Optimization work lowers the run rate
    on its own schedule, and a forecast that only adds new projects will sit above reality until
    somebody reconciles it by hand.
  - |-
    Action 37 records the forecasting approach and action 39 scores how often the forecast is refreshed.
    This action covers the decision process that chooses which scenarios go into it. A practice can hold
    a well documented forecasting approach and still feed it whatever plans arrived by email.
  Overrides: null
