Metadata:
  Proposed: '2025-09-16'
  Adopted: '2025-11-01'
  Modified: '2026-10-18'
  Version: 2.0.0
  Status: Accepted
  Approvers:
  - Name: Victoria Levy
    Email: vlevy573@gmail.com
    Date: '2025-11-01'
  - Name: Andrew Quigley
    Email: Q@mf-family.com
    Date: '2025-11-01'
Specification:
  ID: 35
  Title: Report Estimate Accuracy
  Description: Report estimate accuracy; enforce variance thresholds by maturity.
  Slug: 35-report-accuracy
  Implementation Types:
  - null
  Weight: 1.0
  Formula: |-
    x = Estimates whose actual cost landed inside the variance threshold set for them
    y = All estimates made whose actual cost is now known

    x / y
  Score Type: percent
  Scoring:
  - Score: 0
    Condition: 0%
  - Score: 1
    Condition: 10%
  - Score: 2
    Condition: 20%
  - Score: 3
    Condition: 30%
  - Score: 4
    Condition: 40%
  - Score: 5
    Condition: 50%
  - Score: 6
    Condition: 60%
  - Score: 7
    Condition: 70%
  - Score: 8
    Condition: 80%
  - Score: 9
    Condition: 90%
  - Score: 10
    Condition: Near 100%
  References:
  - Name: FinOps Framework - Planning & Estimating Capability
    Link: https://www.finops.org/framework/capabilities/planning-estimating/
    Comment: |-
      Estimate cost against actual cost trending within an established percentage threshold of variance
      is one of the capability's measures of success. The threshold is the practice's own; the Framework
      sets no number.
  - Name: FinOps++ Score Type - Percentage Calculation
    Link: /guidelines/scoring.md#percentage-calculation
    Comment: a kind of threshold type where the steps are specifically precentages leading to 100%.
  Supplemental Guidance:
  - |
    The denominator counts only estimates whose actual cost is known. An estimate for work that has not
    run yet cannot be right or wrong, and including it would make the number move whenever the pipeline
    changed rather than when accuracy did.
  - |
    A wide threshold makes this number look excellent. A practice allowing fifty percent variance will
    sit near 100% and have learned nothing, so the figure is only meaningful next to the threshold it
    was measured against. Action 30 defines the estimating scope and policy constraints, including that
    threshold, and the two should be read together.
  - |
    The capability expects the threshold to tighten as a practice matures. Its Crawl tier accepts
    estimates that are not especially granular or accurate, its Walk tier expects higher accuracy
    organizationally, and its Run tier expects an explicit range and confidence level rather than a
    single number.
  - |-
    Action 34 chooses which scenarios are estimated and action 40 compares the forecast against actuals.
    This action measures whether the estimates themselves came true.
  Overrides: null