Metadata:
  Proposed: '2025-09-16'
  Adopted: '2025-11-01'
  Modified: '2026-10-18'
  Version: 2.0.0
  Status: Accepted
  Approvers:
  - Name: Victoria Levy
    Email: vlevy573@gmail.com
    Date: '2025-11-01'
  - Name: Andrew Quigley
    Email: Q@mf-family.com
    Date: '2025-11-01'
Specification:
  ID: 60
  Title: Communicate Unit Cost Wins
  Description: Communicate wins (unit cost reductions) to drive cultural adoption.
  Slug: 60-communicate-wins
  Implementation Types:
  - null
  Weight: 1.0
  Formula: |-
    Measured over: every unit cost improvement communicated during the review period.

    * Evidence recorded (each win records the baseline, what was changed, and the outcome)
    * Unit named (the win states which unit metric moved, not only a currency amount)
    * Measurement type separated (avoidance, savings and cost reduction are reported as distinct
      figures rather than one total)
    * Team credited (the team whose change produced the result is named)
    * Delivered per persona (each audience receives it in the channel it already uses)

    10*Ceil(x/5)
  Score Type: bucket
  Scoring:
  - Score: 0
    Condition: No items completed
  - Score: 2
    Condition: 1 item completed
  - Score: 4
    Condition: 2 items completed
  - Score: 6
    Condition: 3 items completed
  - Score: 8
    Condition: 4 items completed
  - Score: 10
    Condition: 5 items completed
  References:
  - Name: FinOps Framework - Unit Economics Capability
    Link: https://www.finops.org/framework/capabilities/unit-economics/
    Comment: |-
      The capability asks Product to capture baseline, intervention and outcome evidence, which is item
      1, and the Practitioner to separate avoidance, savings and cost reduction measurements, which is
      item 3. It also asks for visibility to unit metrics in appropriate channels for each persona.
  - Name: FinOps++ Score Type - Bucket
    Link: /guidelines/scoring.md#bucket-of-accomplishments
    Comment: an evolution of binary, with more steps to take toward maturity.
  Supplemental Guidance:
  - |
    These are scored as a bucket because you can do them in any order. Most practices name a currency
    figure long before they name the unit that moved.
  - |
    Item 2 separates a unit economics win from a savings announcement. Spend falling by
    two hundred thousand could mean the architecture got cheaper or the business got smaller, and only
    the unit metric separates those two.
  - |
    Item 3 exists because the three figures are not interchangeable. Avoidance is cost that never
    arrived, savings is cost that fell, and a reduction can be either. Reporting one total invites a
    finance partner to look for money that is not in the budget.
  - |
    The capability describes unit costs as guiding a cultural shift rather than only reporting one,
    which is item 5. A win delivered where engineers already work changes behavior; the same
    win in a monthly finance pack does not reach them.
  - |-
    Action 95 publishes the practice's wins and misses generally. This action is narrower, covering unit
    cost improvements and the evidence behind them. Action 55 defines the units and action 56 documents
    how they are calculated.
  Overrides: null
