Metadata:
  Proposed: '2025-09-16'
  Adopted: '2026-05-13'
  Modified: '2026-10-18'
  Version: 2.0.0
  Status: Accepted
  Approvers:
  - Name: Victoria Levy
    Email: vlevy573@gmail.com
    Date: '2026-05-13'
Specification:
  ID: 75
  Title: Integrate Billing with Procurement
  Description: Integrate billing + entitlement data with Procurement/ITAM/SAM.
  Slug: 75-integrate-billing
  Implementation Types:
  - null
  Weight: 1.0
  Formula: |-
    Measured over: the license and SaaS billing and entitlement feeds in use during the review period.

    * Retrieved without a person (billing arrives on a schedule rather than being downloaded by hand)
    * Normalized schema (billing arrives in a common format such as FOCUS rather than per vendor
      exports)
    * Entitlements joined (purchased quantities sit alongside the spend, so utilization can be computed)
    * Shared with asset management (contracts, usage and spend are available to the IT and software
      asset management functions rather than held inside FinOps)
    * Named counterparts (Procurement, Finance and asset management each have a named contact)

    10*Ceil(x/5)
  Score Type: bucket
  Scoring:
  - Score: 0
    Condition: No items completed
  - Score: 2
    Condition: 1 item completed
  - Score: 4
    Condition: 2 items completed
  - Score: 6
    Condition: 3 items completed
  - Score: 8
    Condition: 4 items completed
  - Score: 10
    Condition: 5 items completed
  References:
  - Name: FinOps Framework - Licensing & SaaS Capability
    Link: https://www.finops.org/framework/capabilities/licensing-saas/
    Comment: |-
      Its Walk tier expects licensing and SaaS billing data to arrive in FOCUS format, and its Run tier
      expects billing retrieval to be automated where possible and FinOps and software asset management
      to share tooling and data for contracts, usage and spend.
  - Name: FinOps++ Score Type - Bucket
    Link: /guidelines/scoring.md#bucket-of-accomplishments
    Comment: an evolution of binary, with more steps to take toward maturity.
  Supplemental Guidance:
  - |
    These are scored as a bucket because you can do them in any order. Named counterparts usually come
    first, because the data arrives by asking someone before it arrives on a schedule.
  - |
    Item 3 makes the capability measurable. Spend without entitlement counts
    cannot produce a utilization rate, so a practice missing this item can report what it paid and not
    whether it used what it bought.
  - |
    Item 4 is where the data sits rather than who owns it. Asset management teams hold the contract
    and license position, and a practice that keeps usage data to itself leaves them reconciling by
    email.
  - |-
    Action 1 in the Data Ingestion capability covers inventorying data sources generally. This action is
    narrower, covering the license and SaaS feeds and the entitlement data that has to arrive with them.
  Overrides: null
