Metadata:
  Proposed: '2025-09-16'
  Adopted: '2026-05-13'
  Modified: '2026-10-18'
  Version: 2.0.0
  Status: Accepted
  Approvers:
  - Name: Victoria Levy
    Email: vlevy573@gmail.com
    Date: '2026-05-13'
Specification:
  ID: 93
  Title: Integrate Cost Data in Workflows
  Description: Integrate cost data into forecasting, budgeting, procurement workflows.
  Slug: 93-integrate-cost
  Implementation Types:
  - null
  Weight: 1.0
  Formula: |-
    Measured over: the forecasting, budgeting, and procurement workflows the organization runs.

    * Forecasting consumes cost data (the forecast is built from the same cost data the practice
      publishes, not a separate extract)
    * Budgeting consumes cost data (budget setting and tracking draw on it)
    * Procurement consumes cost data (renewal and purchase decisions see current and committed spend)
    * Delivered where the work happens (the data reaches each workflow in the tool its owners already
      use rather than a FinOps report they must seek out)
    * Freshness stated (each workflow records how current the data it receives is)

    10*Ceil(x/5)
  Score Type: bucket
  Scoring:
  - Score: 0
    Condition: No items completed
  - Score: 2
    Condition: 1 item completed
  - Score: 4
    Condition: 2 items completed
  - Score: 6
    Condition: 3 items completed
  - Score: 8
    Condition: 4 items completed
  - Score: 10
    Condition: 5 items completed
  References:
  - Name: FinOps Framework - FinOps Practice Operations Capability
    Link: https://www.finops.org/framework/capabilities/finops-practice-operations/
    Comment: |-
      The capability frames Practice Operations as driving a culture of accountability by running an
      effective FinOps team, and names organizational adoption of FinOps practices among its measures of
      success. Cost data that never reaches a workflow cannot drive a decision in it.
  - Name: FinOps++ Score Type - Bucket
    Link: /guidelines/scoring.md#bucket-of-accomplishments
    Comment: an evolution of binary, with more steps to take toward maturity.
  Supplemental Guidance:
  - |
    These are scored as a bucket because the three workflows are independent. Procurement often
    integrates last, because it sits furthest from the engineering tooling most practices start with.
  - |
    Item 4 separates integration from reporting. A monthly deck emailed to budget owners is not
    integration, because the decision happens in the budgeting tool and the deck is somewhere else.
  - |
    With item 5, the procurement team deciding a renewal against data three months
    old will make a worse call than one that is aware the data is three months old and waits.
  - |-
    The Forecasting, Budgeting, and Invoicing capabilities score what those workflows do with the data.
    This action scores only whether the data reaches them.
  Overrides: null
