Metadata:
  Proposed: '2025-09-16'
  Adopted: '2025-11-01'
  Modified: '2026-05-12'
  Version: 2.1.0
  Status: Accepted
  Approvers:
  - Name: Victoria Levy
    Email: vlevy573@gmail.com
    Date: '2025-11-01'
  - Name: Andrew Quigley
    Email: Q@mf-family.com
    Date: '2025-11-01'
Specification:
  ID: 125
  Title: Evaluate Build vs Buy Options
  Description: Evaluate build vs buy; map requirements to vendor capabilities.
  Slug: 125-evaluate-build
  Implementation Types:
  - null
  Weight: 1.0
  Formula: |
    * Weighted sum
      TCO (score x3),
      Vendor scoring (score x3),
      Decision document (score x3),
      Rules established (score x1).
      Max Raw Score (29)
    * TCO_Analysis - Total Cost of Ownership analysis performed
      (0=None, 1=High-level, 2=Detailed, 3=Validated with Finance)
    * Vendor_Scored - Vendor options scored against criteria
      (0=None, 1=Informal, 2=Structured scorecard, 3=Multi-stakeholder RFP)
    * Decision_Doc - Build vs Buy decision formally documented and approved
      (0=No, 1=Informal note, 2=Formal doc, 3=Exec-approved+reviewed)
    * Rules_Est - Guiding rules / policy established for future decsions
      (0=No rules, 1=Draft, 2=Published+Enforced)
    * Output Range (0 - Max Raw)
  Score Type: multi_bucket
  Scoring:
  - Score: 0
    Condition: Low Maturity, Score Range (0-8)
  - Score: 4
    Condition: Developing, Score Range (9-17)
  - Score: 7
    Condition: Established, Score Range (18-24)
  - Score: 10
    Condition: Optimizing, Score Range (25-29)
  References:
  - Name: Maturity Definition
    Link: https://www.finops.org/framework/maturity-model/
    Comment: null
  - Name: FinOps++ Score Type - Multiple Weighted Bucket
    Link: /guidelines/scoring.md##multiple-weighted-buckets
    Comment: an even more granular version of bucket, where steps are weight by importance to an action.
  Supplemental Guidance:
  - |
    CRAWL (0-8) No build-vs-buy process exists. TCO analysis is absent or undocumented, vendor comparisons are
    informal, and decisions default to familiarity, relationships, or cost alone.
  - |
    WALK (9-17) Basic TCO covers License costs and implementation effort. Vendors are scored against a structured
    scorecard, and decisions are loosely documented. Finance validation and exec sign-off are inconsistent.
  - |
    RUN (18-24) TCO is detailed, covering licensing, implementation, integration, training, support, and build
    opportunity cost. A multi-stakeholder evaluation process is used, decisions are formally approved, and a guiding
    policy is published and partially enforced.
  - |-
    FLY (25-29) TCO is Finance-validated and accounts for multi-year trajectories, exit costs, and strategic
    optionality. A full RFP with documented rationale is used, decisions are exec-approved and periodically reviewed,
    and an enforced org-wide policy governs all future build-vs-buy choices.
  Overrides: null
